Home
About
Product
News
Contact
Service
Language
The highest domestic wind turbine was merged into Jiangsu power grid for the first time
Release time:2019-12-07

On December 14, at the bank of Guangyang Lake in Baoying County, Jiangsu Province, according to the instructions of the dispatcher of Jiangsu Electric Power Dispatching Control Center, Rongbao Dabaoying County Guangyang Lake Wind Farm was integrated into Jiangsu Power Grid for the first time. On the same day, the first batch of 30 wind turbines were officially connected to the grid. In the future, about 260 million kilowatt-hours of clean electricity will be integrated into the national grid from here in the future, which will be imported into thousands of households. This is also the country's highest batch-mounted steel tower with a hub height of 152 meters and a blade tip height of 92 meters above the ground.

Source of this article: China Electric Power News Network